We completed the marsh task north and west with the lake in December 2017 and were being in a position to re-build the lake degree by introducing back the top one foot that we experienced to hold the lake down so as to drain and get the job done in those marshes. A barrier was put up to prevent motor vehicles from driving out on to the jetty,